Name of the task : Fabrication and delivery of the steel structure of roller table by the unloading side of the Sump Furnace on the premises of the Huta Bankowa in Dąbrowa Górnicza.
Industry: structural, anti-corrosion.
Scope of performed works:
- Disassembly of old roller table
- Delivery of new elements:
- Prefabrication and delivery of roller table frame - 45 000 kg,
- Prefabrication and delivery of platform plates – 3000 kg,
- Delivery of levelling washers for new equipment - 300 kg,
- Corrosion protection for new components
- Assembly of new equipment :
- Roller table frames on steel washers – 45 000 kg,
- Drives, gearboxes and other components of the roller table - 50 016 kg,
- Floor plates along the roller table self-tacking side to secure the transport of the string – 3000 kg
Implementation: 2017-2018
General Contractor / Purchaser: Optimal Sp. z o.o.
Investor: ArcelorMittal Poland S.A.
Subcontractor: HPR Dąbrowa Górnicza S.A.