Construction of a nitrogen pipeline in AMP in Dąbrowa Górnicza
1 May 2020
Renovation of the stacker-reclaimer No. 3 in AMP in Dąbrowa Górnicza
29 April 2020

Transfer installation from PT-142C to PT476 and 477 in AMP in Dąbrowa Górnicza

Name of the task: Installation of additional transfer from PT-142C to PT476 and 477 in ArcelorMittal Poland S.A. in Dąbrowa Górnicza

Industry: design, construction, structural and assembly, electrical.

Scope of performed works:

  • Preparation of the construction design,
  • Execution of foundation works and survey measurements,
  • Rebuilding of P30 node and PT 476 and 477 conveyors,
  • Assembly of the new conveyor and belt,
  • Installation of force and control of a belt conveyor,
  • Installation of power auxiliary and lighting,
  • Design and execution of power hydraulics.

Implementation: 2017

Purchaser: ArcelorMittal Poland S.A.

Investor: ArcelorMittal Poland S.A.

General Contractor: HPR Dąbrowa Górnicza S.A.