Name of the task: Construction on II stage of flue gas desulphurization installation for WP-70 boiler house in Przedsiębiorstwo Energetyki Cieplnej Sp. z o.o. in Gliwice.
Industry: construction, insulation, structural, installation, anticorrosion.
Scope of performed works:
- Construction of foundations of oil pumping station tanks, flyovers,
- Prefabrication of steel structures with corrosion protection,
- Prefabrication, delivery and installation of gas and flue gas pipes and support structures for pipes,
- Prefabrication, delivery and assembly of tanks: absorber V=1 360 m3, desulphurization product V=427 m3, lime milk V=146 m3,
- Thermal insulation of flue ducts, absorber,
- Ventilation systems, sewage systems,
- Execution of oil-resistant floors,
- Assembly of equipment, e.g.: hoists, increment breakers, vibration isolators, fans, etc.,
- Prefabrication, anti-corrosion protection, delivery and assembly of flue gas desulphurization product tank,
- Prefabrication, delivery and assembly of the steel structure of the lift shaft.
Implementation: 2015-2017
General Contractor / Purchaser: Przedsiębiorstwo Energetyki Cieplnej Sp. z o.o. in Gliwice / AMK Kraków S.A.
Investor: Przedsiębiorstwo Energetyki Cieplnej Sp. z o.o. in Gliwice
Subcontractor: HPR Dąbrowa Górnicza S.A.